Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0470 # 05 Y:2000 | 05 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $1,402 | $280 | Implemented |
MA0470 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $280 | Implemented |
MA0470 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $206 | $450 | Implemented |
WI0381 # 01 Y:2000 | 01 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,973 | $29,550 | Not Implemented |
WI0381 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,183 | $4,000 | Implemented |
WI0381 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $3,541 | $0 | Implemented |
WI0381 # 04 Y:2000 | 04 | 2000 | INSTALL AUTOMATIC STACK DAMPER | $1,157 | $1,000 | Implemented |
WI0381 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,869 | $8,223 | Not Implemented |
WI0381 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $242 | $300 | Not Implemented |
WI0381 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,293 | $840 | Not Implemented |
WI0381 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,028 | $1,300 | Implemented |
WI0381 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $945 | $0 | Not Implemented |
WI0381 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $417 | $687 | Not Implemented |
WI0381 # 11 Y:2000 | 11 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $184 | $0 | Not Implemented |
WI0381 # 12 Y:2000 | 12 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $124 | $300 | Implemented |
UM0166 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $244 | $400 | Not Implemented |
UM0166 # 02 Y:2000 | 02 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,683 | $1,700 | Not Implemented |
UM0166 # 03 Y:2000 | 03 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $2,815 | $10,000 | Not Implemented |
UM0166 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,595 | $11,900 | Not Implemented |
UM0166 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $562 | $3,120 | Not Implemented |
UM0166 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,705 | $5,925 | Implemented |
UM0161 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,365 | $450 | Implemented |
UM0161 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,614 | $500 | Not Implemented |
UM0161 # 03 Y:2000 | 03 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $48,437 | $500 | Implemented |
UM0161 # 04 Y:2000 | 04 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,098 | $656 | Not Implemented |