IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0470 # 05 Y:2000 05 2000 UPGRADE CONTROLS ON COMPRESSORS $1,402 $280 Implemented
MA0470 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $396 $280 Implemented
MA0470 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $450 Implemented
WI0381 # 01 Y:2000 01 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,973 $29,550 Not Implemented
WI0381 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,183 $4,000 Implemented
WI0381 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,541 $0 Implemented
WI0381 # 04 Y:2000 04 2000 INSTALL AUTOMATIC STACK DAMPER $1,157 $1,000 Implemented
WI0381 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,869 $8,223 Not Implemented
WI0381 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $242 $300 Not Implemented
WI0381 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $840 Not Implemented
WI0381 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,028 $1,300 Implemented
WI0381 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $945 $0 Not Implemented
WI0381 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $417 $687 Not Implemented
WI0381 # 11 Y:2000 11 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $184 $0 Not Implemented
WI0381 # 12 Y:2000 12 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $300 Implemented
UM0166 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $244 $400 Not Implemented
UM0166 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,683 $1,700 Not Implemented
UM0166 # 03 Y:2000 03 2000 USE RADIANT HEATER FOR SPOT HEATING $2,815 $10,000 Not Implemented
UM0166 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,595 $11,900 Not Implemented
UM0166 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $562 $3,120 Not Implemented
UM0166 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,705 $5,925 Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
UM0161 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,098 $656 Not Implemented