IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0123 # 04 Y:2022 04 2022 IMPROVE LUBRICATION PRACTICES $27,999 $8,008 n/a
CW0123 # 05 Y:2022 05 2022 USE OPTIMUM TEMPERATURE $4,521 $3,500 n/a
CW0123 # 06 Y:2022 06 2022 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $2,357 $0 n/a
CW0123 # 07 Y:2022 07 2022 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $30,793 $45,000 n/a
CW0123 # 08 Y:2022 08 2022 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $7,698 $5,000 n/a
CW0123 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $12,694 n/a
CW0123 # 10 Y:2022 10 2022 USE POWER DURING OFF-PEAK PERIODS $1,949 $0 n/a
OR0751 # 01 Y:2022 01 2022 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,526 $140 Not Implemented
OR0751 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,956 $1,175 Not Implemented
OR0751 # 03 Y:2022 03 2022 FILTER AND REUSE HYDRAULIC OIL $74,774 $48,589 Not Implemented
OR0751 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,125 $1,272 Not Implemented
TT0269 # 01 Y:2022 01 2022 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $24,682 $2,000 Not Implemented
TT0269 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,069 $25,000 Not Implemented
TT0269 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,223 $27,500 Not Implemented
TT0269 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $3,500 Not Implemented
TT0269 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,648 $2,500 Not Implemented
TT0269 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,911 $11,000 Not Implemented
WV0618 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $354 $90 Implemented
WV0618 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $369 $1,670 Implemented
WV0618 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,089 $525 Implemented
WV0618 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $1,409 $3,970 Not Implemented
WV0618 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,452 $1,125 Implemented
WV0618 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,969 $4,600 Not Implemented
WV0618 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,096 $10,131 Not Implemented
DL0200 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,029 $0 Not Implemented