Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0170 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $210,423 | $300,000 | Not Implemented |
LE0170 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,647 | $7,000 | Implemented |
LE0170 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $952 | $0 | Implemented |
LE0170 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $367 | $0 | Implemented |
LE0170 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $440 | $560 | Not Implemented |
LE0170 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $425 | $825 | Not Implemented |
SU0158 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $95,164 | $235,000 | Not Implemented |
SU0158 # 12 Y:2003 | 12 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,302 | $3,256 | Not Implemented |
SU0158 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $152,410 | $301,250 | Not Implemented |
SU0158 # 01 Y:2003 | 01 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $161,780 | $4,536 | Implemented |
SU0158 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $67,325 | $5,200 | Implemented |
SU0158 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $24,189 | $70,275 | Not Implemented |
SU0158 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,432 | $0 | Implemented |
SU0158 # 09 Y:2003 | 09 | 2003 | ELIMINATE SHIFT | $5,056 | $0 | Implemented |
SU0158 # 10 Y:2003 | 10 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,599 | $0 | Implemented |
SU0158 # 08 Y:2003 | 08 | 2003 | RECOVER AND REUSE SPENT ACID BATHS | $7,052 | $6,521 | Not Implemented |
SU0158 # 06 Y:2003 | 06 | 2003 | USE SYNTHETIC LUBRICANT | $10,573 | $1,000 | Implemented |
TA0054 # 03 Y:2003 | 03 | 2003 | USE OPTIMUM TEMPERATURE | $1,215 | $0 | Implemented |
TA0054 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $907 | $54 | Not Implemented |
TA0054 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $266 | $444 | Implemented |
SU0158 # 11 Y:2003 | 11 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,892 | $0 | Implemented |
TA0054 # 01 Y:2003 | 01 | 2003 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $1,000,000 | $25,150 | Not Implemented |
TA0054 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $757 | $1,550 | Implemented |
TA0054 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,893 | $0 | Implemented |
TA0054 # 06 Y:2003 | 06 | 2003 | USE SYNTHETIC LUBRICANT | $316 | $0 | Implemented |