Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0634 # 01 Y:2025 | 01 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,476 | $12,413 | n/a |
UF0634 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,463 | $60,000 | n/a |
UF0634 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,705 | $4,689 | n/a |
UF0634 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,396 | $25,300 | n/a |
UF0634 # 08 Y:2025 | 08 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $22,260 | $2,620 | n/a |
UF0634 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $326 | $1,500 | n/a |
UF0634 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $583 | $0 | n/a |
UF0634 # 05 Y:2025 | 05 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,037 | $1,677 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |