IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0280 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $2,086 $128 Implemented
UM0280 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,470 $484 Implemented
UM0280 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $750 Implemented
UM0280 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $654 $225 Implemented
GT0802 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $300 Implemented
GT0802 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $18,100 $10,800 Implemented
GT0802 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $6,510 Implemented
GT0802 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $0 Implemented
GT0802 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,780 $5,000 Implemented
AM0489 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,140 $0 Implemented
AM0489 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,500 $5,200 Implemented
AM0489 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $1,000 Implemented
AM0486 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,394 $50 Implemented
AM0486 # 02 Y:2005 02 2005 INSTALL SKYLIGHTS $1,020 $0 Implemented
AM0486 # 03 Y:2005 03 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $710 $290 Implemented
AM0486 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $702 $0 Implemented
AM0486 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $502 $400 Implemented
AM0486 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $307 Implemented
AM0486 # 07 Y:2005 07 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $175 $700 Implemented
UD0716 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,047 $65,800 Implemented
UD0716 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,922 $1,440 Implemented
SD0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,898 $600 Implemented
SD0359 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Implemented
SD0359 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,599 $1,388 Implemented
SD0359 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,417 $59,829 Implemented