IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0689 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $252 Implemented
BD0264 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,965 $200 Implemented
BD0264 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,433 $60 Implemented
BD0264 # 04 Y:2004 04 2004 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,232 $3,600 Implemented
BD0264 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $182 Implemented
BD0264 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $345 Implemented
BD0264 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $282 $600 Implemented
BD0264 # 11 Y:2004 11 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,760 $2,200 Implemented
BD0264 # 12 Y:2004 12 2004 AUTOMATE PAYROLL SYSTEM $2,500 $3,000 Implemented
BD0264 # 13 Y:2004 13 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $2,800 $432 Implemented
BD0264 # 14 Y:2004 14 2004 PURCHASE APPROPRIATELY SIZED MATERIAL $2,550 $500 Implemented
LL0188 # 01 Y:2004 01 2004 ADD AREA LIGHTING SWITCHES $37,447 $4,522 Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented
IA0341 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,990 Implemented
IA0341 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $123 $289 Implemented
BD0260 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,265 $0 Implemented
BD0260 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,158 $900 Implemented
BD0260 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $5,118 $6,900 Implemented
BD0260 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,159 $1,159 Implemented
BD0260 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,427 $3,000 Implemented
BD0260 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,226 $1,000 Implemented