Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
227
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0480 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $10,600 | $5,000 | Implemented |
MA0480 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,330 | $8,000 | Implemented |
MA0480 # 11 Y:2000 | 11 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,020 | $0 | Implemented |
MA0480 # 12 Y:2000 | 12 | 2000 | INSTALL OCCUPANCY SENSORS | $12,215 | $1,000 | Implemented |
MA0480 # 09 Y:2000 | 09 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $930 | $0 | Implemented |
MA0480 # 08 Y:2000 | 08 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,620 | $2,000 | Implemented |
MA0480 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,660 | $5,000 | Implemented |
MA0480 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,450 | $27,000 | Implemented |
IA0262 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $788 | $221 | Implemented |
IA0262 # 06 Y:2000 | 06 | 2000 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $522 | $640 | Implemented |
IA0262 # 03 Y:2000 | 03 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,048 | $0 | Implemented |
AM0380 # 09 Y:2000 | 09 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $265 | $0 | Implemented |
AM0380 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $520 | $25 | Implemented |
AM0380 # 05 Y:2000 | 05 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $527 | $800 | Implemented |
AM0380 # 02 Y:2000 | 02 | 2000 | COMBINE UTILITY METERS | $3,644 | $8,000 | Implemented |
AM0380 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,800 | $50 | Implemented |
AM0380 # 04 Y:2000 | 04 | 2000 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,798 | $0 | Implemented |
NV0170 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,657 | $360 | Implemented |
CO0475 # 05 Y:2000 | 05 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,430 | $0 | Implemented |
NV0170 # 04 Y:2000 | 04 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $8,109 | $14,542 | Implemented |
CO0475 # 06 Y:2000 | 06 | 2000 | $34,630 | $100,000 | Implemented | |
CO0475 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $300 | $490 | Implemented |
NV0170 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $985 | $100 | Implemented |
AS0289 # 02 Y:2000 | 02 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,081 | $9,000 | Implemented |
AS0289 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,898 | $18,153 | Implemented |