IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

871

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0796 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $786 $1,850 Implemented
OK0779 # 01 Y:2009 01 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,513 $900,000 Not Implemented
OK0779 # 02 Y:2009 02 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122,608 $160,000 Not Implemented
OK0779 # 03 Y:2009 03 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0779 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $6,396 Not Implemented
OK0779 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,634 $26,750 Implemented
OK0779 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,089 $14,467 Implemented
OK0779 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,569 $0 Implemented
OK0779 # 08 Y:2009 08 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,812 $1,944 Implemented
OK0779 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $7,677 $989 Not Implemented
OK0762 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164,842 $297,920 Implemented
OK0762 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $14,224 $54,912 Implemented
OK0762 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,433 $104,000 Not Implemented
OK0762 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,975 $8,646 Not Implemented
OK0762 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,605 $1,000 Implemented
OK0762 # 06 Y:2008 06 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $238,891 $232,766 Implemented
OK0762 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,165 $0 Implemented
OK0743 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,598 $3,500 Implemented
OK0743 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $21,613 $2,450 Implemented
OK0743 # 06 Y:2007 06 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,607 $0 Not Implemented
OK0743 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,413 $723 Implemented
OK0743 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $22,720 $5,010 Implemented
OK0743 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $569 Implemented
OK0743 # 03 Y:2007 03 2007 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $642 $6,000 Implemented
OK0720 # 01 Y:2006 01 2006 USE OPTIMUM TEMPERATURE $10,475 $1,000 Implemented