IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0757 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,547 $1,600 Implemented
UD0757 # 04 Y:2007 04 2007 USE OPTIMUM TEMPERATURE $8,681 $0 Not Implemented
UD0757 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,031 $0 Implemented
UD0757 # 06 Y:2007 06 2007 USE OPTIMUM THICKNESS INSULATION $5,633 $606 Not Implemented
UD0757 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $5,019 $0 Not Implemented
UD0757 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,293 $0 Implemented
UD0757 # 09 Y:2007 09 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,300 $992 Not Implemented
OK0743 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $22,720 $5,010 Implemented
OK0743 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,189 $569 Implemented
OK0743 # 03 Y:2007 03 2007 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $642 $6,000 Implemented
OK0743 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,598 $3,500 Implemented
OK0743 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $21,613 $2,450 Implemented
OK0743 # 06 Y:2007 06 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,607 $0 Not Implemented
OK0743 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,413 $723 Implemented
MS0312 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,487 $38,702 Not Implemented
MS0312 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,170 $1,559 Not Implemented
MS0312 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,372 $135 Not Implemented
MS0312 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $551 $4,911 Not Implemented
MA0612 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $96,635 $175,500 Not Implemented
MA0612 # 02 Y:2007 02 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $57,921 $108,000 Not Implemented
MA0612 # 03 Y:2007 03 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $23,433 $12,750 Not Implemented
MA0612 # 04 Y:2007 04 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $21,000 $73,760 Not Implemented
MA0612 # 05 Y:2007 05 2007 REDUCE VENTILATION AIR $17,480 $8,040 Not Implemented
MA0612 # 06 Y:2007 06 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $16,924 $3,200 Not Implemented
MA0612 # 07 Y:2007 07 2007 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,963 $26,370 Not Implemented