IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

871

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0675 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $428 $2,730 Not Implemented
OK0675 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,672 $2,173 Not Implemented
OK0675 # 08 Y:2003 08 2003 INSTALL SET-BACK TIMERS $1,993 $0 Not Implemented
OK0675 # 09 Y:2003 09 2003 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $14,350 $23,640 Not Implemented
OK0675 # 10 Y:2003 10 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $61,378 $3,000 Not Implemented
OK0675 # 11 Y:2003 11 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $668 $287 Not Implemented
OK0669 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,727 $15,485 Not Implemented
OK0669 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,435 $8,500 Implemented
OK0669 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $19,611 $12,000 n/a
OK0669 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,626 $3,500 Implemented
OK0669 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,966 $3,467 Implemented
OK0669 # 06 Y:2003 06 2003 INSTALL SET-BACK TIMERS $1,069 $463 Implemented
OK0669 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,052 $1,468 Implemented
OK0661 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $72,173 $0 Not Implemented
OK0661 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $20,400 $0 Implemented
OK0661 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,245 $7,483 Not Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $1,271 $3,206 Not Implemented
OK0661 # 06 Y:2003 06 2003 USE COMPRESSOR AIR FILTERS $3,339 $168 Not Implemented
OK0661 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $441 $262 Not Implemented
OK0661 # 08 Y:2003 08 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,061 $45,000 Implemented
OK0661 # 09 Y:2003 09 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,440 $2,500 Implemented
OK0649 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $3,504 Implemented
OK0649 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $104 $37 Implemented
OK0649 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $16,238 $35,000 Not Implemented