IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0051 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,680 $5,175 Not Implemented
WM0051 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,345 $35,000 Not Implemented
WM0051 # 08 Y:2014 08 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,378 $3,000 Not Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
UM0450 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $58,763 $200,000 Not Implemented
UM0450 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,421 $26,000 Not Implemented
UM0450 # 03 Y:2014 03 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,065 $22,600 Not Implemented
UM0450 # 04 Y:2014 04 2014 REVISE SMOKE CLEANUP FROM OPERATIONS $14,049 $6,000 Not Implemented
LE0379 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,081 $40 Implemented
LE0379 # 02 Y:2014 02 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,602 $225 Implemented
LE0379 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,644 $900 Implemented
LE0379 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,923 $1,680 Not Implemented
LE0379 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,017 $500 Not Implemented
LE0379 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,721 $1,500 Not Implemented
LE0379 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $5,736 $8,213 Not Implemented
LE0379 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,950 $11,700 Not Implemented
LE0379 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,611 $3,025 Not Implemented
LE0379 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $6,671 $12,825 Not Implemented
LE0379 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $780 Implemented
LE0379 # 12 Y:2014 12 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,820 $6,500 Not Implemented
LE0379 # 13 Y:2014 13 2014 RECOVER WASTE HEAT FROM EQUIPMENT $330 $1,250 Not Implemented
LE0379 # 14 Y:2014 14 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,690 $8,000 Not Implemented
SD0485 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,088 $25,225 Not Implemented
SD0485 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,720 $5,000 Implemented
SD0485 # 03 Y:2014 03 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,053 $91,900 Implemented