IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0642 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $9 Implemented
AM0642 # 10 Y:2013 10 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $171 $0 Implemented
AM0642 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,225 $0 Implemented
AM0642 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $6,760 $22,800 Not Implemented
AM0642 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,950 $560 Implemented
AM0642 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,645 $2,652 Implemented
AM0642 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $636 Implemented
AM0642 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $500 Implemented
AM0642 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,220 $400 Implemented
AM0642 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
SU0345 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $97 $0 Not Implemented
SU0345 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $132 Not Implemented
SU0345 # 03 Y:2013 03 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $335 $738 Not Implemented
SU0345 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $155 $655 Not Implemented
SU0345 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $238 Not Implemented
IA0497 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $19,923 $46,094 Implemented
IA0497 # 02 Y:2013 02 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,463 $2,391 Not Implemented
IA0497 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,575 $3,675 Not Implemented
IA0497 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,214 $1,720 Implemented
IA0497 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,881 $4,000 Not Implemented
IA0497 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,468 $1,500 Implemented
IA0497 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,000 $7,560 Not Implemented
SD0472 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $7,834 $3,850 Implemented
SD0472 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,979 $900 Implemented
SD0472 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $4,079 $11,220 Implemented