Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,265
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0608 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $12,691 | $3,566 | Not Implemented |
AM0608 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,360 | $65 | Not Implemented |
AM0608 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $1,625 | Implemented |
BD0409 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,259 | $41,728 | Implemented |
BD0409 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $11,228 | $2,550 | Implemented |
BD0409 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,270 | $2,500 | Not Implemented |
BD0409 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,040 | $3,510 | Implemented |
BD0409 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,253 | $10 | Not Implemented |
BD0409 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $793 | $500 | Not Implemented |
BD0409 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $535 | $450 | Implemented |
BD0409 # 08 Y:2012 | 08 | 2012 | USE PHOTOCELL CONTROLS | $307 | $200 | Implemented |
BD0409 # 09 Y:2012 | 09 | 2012 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,782 | $1,500 | Not Implemented |
BD0409 # 10 Y:2012 | 10 | 2012 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,032 | $1,600 | Not Implemented |
BD0409 # 11 Y:2012 | 11 | 2012 | USE EVAPORATION TO CONCENTRATE MATERIAL | $153 | $600 | Not Implemented |
DL0085 # 01 Y:2012 | 01 | 2012 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $37,175 | $100 | Not Implemented |
DL0085 # 02 Y:2012 | 02 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,948 | $100 | Implemented |
DL0085 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,212 | $6,080 | Implemented |
DL0085 # 04 Y:2012 | 04 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,500 | $21,080 | Implemented |
DL0085 # 05 Y:2012 | 05 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,910 | $51,500 | Implemented |
DL0085 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,995 | $4,850 | Implemented |
DL0085 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,020 | $2,800 | Implemented |
DL0085 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $2,640 | $620 | Implemented |
DL0085 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,794 | $80,000 | Not Implemented |
DL0085 # 10 Y:2012 | 10 | 2012 | REVISE SMOKE CLEANUP FROM OPERATIONS | $3,290 | $11,200 | Implemented |
DL0085 # 11 Y:2012 | 11 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,894 | $11,040 | Not Implemented |