IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1807 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,717 $3,050 Not Implemented
CL1807 # 05 Y:2018 05 2018 REPLACE BOILER $1,478 $750 Not Implemented
CL1805 # 01 Y:2018 01 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,691 $506,862 Implemented
CL1805 # 03 Y:2018 03 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $637 $2,500 Not Implemented
CL1805 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $13,011 Implemented
CL1702 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $2,406 $0 Not Implemented
CL1702 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,002 $2,080 Not Implemented
CL1702 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,978 $250 Not Implemented
CL1702 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,132 $16,213 Not Implemented
NC0582 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,269 $199,760 Implemented
NC0582 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,895 $100 Not Implemented
NC0582 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $1,021 $500 Implemented
NC0582 # 12 Y:2017 12 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,886 $4,100 Not Implemented
NC0582 # 02 Y:2017 02 2017 DISCONNECT BALLASTS $6,320 $550 Not Implemented
NC0582 # 10 Y:2017 10 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,578 $500 Implemented
NC0582 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,470 $4,500 Not Implemented
NC0582 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $38,581 $20,000 Implemented
NC0582 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,782 $5,865 Implemented
NC0582 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $8,560 $17,350 Implemented
NC0582 # 07 Y:2017 07 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,603 $500 Implemented
NC0582 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,983 $200 Implemented
NC0560 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $35,613 $105,000 Not Implemented
NC0560 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,243 $26,000 Implemented
NC0560 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,027 $500 Not Implemented
NC0560 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,287 $100 Not Implemented