IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0555 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,046 $9,800 Not Implemented
IA0555 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,345 $65,008 Implemented
IA0555 # 06 Y:2016 06 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $304 $500 Not Implemented
IA0555 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $574 $1,680 Implemented
IA0555 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $190 Implemented
IA0555 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $518 $500 Implemented
IA0497 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,000 $7,560 Not Implemented
IA0497 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,468 $1,500 Implemented
IA0497 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,881 $4,000 Not Implemented
IA0497 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,214 $1,720 Implemented
IA0497 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,575 $3,675 Not Implemented
IA0497 # 02 Y:2013 02 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,463 $2,391 Not Implemented
IA0497 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $19,923 $46,094 Implemented
IA0352 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,216 $416 Implemented
IA0352 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,699 $3,750 Implemented
IA0352 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $6,618 Implemented
IA0352 # 08 Y:2004 08 2004 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $4,044 $440 Not Implemented
IA0352 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,245 $6 Implemented
IA0352 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,182 $1 Not Implemented
IA0352 # 05 Y:2004 05 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $12,016 $2 Implemented
IA0352 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $136 Implemented
IA0352 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $867,815 $171 Implemented
DS0169 # 09 Y:2000 09 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $600 $1,288 Implemented
DS0169 # 08 Y:2000 08 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,929 $12,962 Implemented
DS0169 # 02 Y:2000 02 2000 USE OPTIMUM THICKNESS INSULATION $496 $316 Not Implemented