IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,187

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0198 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $267 $675 Not Implemented
BD0198 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $138 Implemented
BD0198 # 10 Y:2002 10 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $187 $0 Implemented
BD0198 # 11 Y:2002 11 2002 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $18,401 $3,000 Not Implemented
BD0198 # 12 Y:2002 12 2002 MINIMIZE WATER USAGE $185 $230 Implemented
BD0198 # 13 Y:2002 13 2002 AUTOMATE PAYROLL SYSTEM $4,825 $2,000 Not Implemented
IC0023 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,245 $900 n/a
IC0023 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $150 n/a
IC0023 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,208 $14,105 n/a
IC0023 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,187 $14,750 n/a
IC0023 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,046 $501 n/a
IC0023 # 06 Y:2001 06 2001 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $11,745 $14,000 n/a
IC0023 # 07 Y:2001 07 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,070 $2,812 n/a
IC0023 # 08 Y:2001 08 2001 RECOVER AND REUSE WASTE MATERIAL $14,413 $72,000 n/a
BD0195 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,060 $28,920 n/a
BD0195 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $15,876 $16,455 n/a
BD0195 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,419 $7,120 Not Implemented
BD0195 # 04 Y:2001 04 2001 USE RADIANT HEATER FOR SPOT HEATING $4,255 $4,000 Not Implemented
BD0195 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $3,191 $1,200 Not Implemented
BD0195 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,345 $1,000 Not Implemented
BD0195 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,269 $1,500 Not Implemented
BD0195 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $838 $400 Implemented
BD0195 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $541 Not Implemented
BD0195 # 10 Y:2001 10 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $13,105 $27,000 n/a
BD0193 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $68,706 $29,000 Implemented