IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,027

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0393 # 09 Y:2001 09 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $600 $300 Not Implemented
AM0393 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $2,570 Not Implemented
AM0387 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $13,300 $45,140 Implemented
AM0387 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $3,480 $5,820 Implemented
AM0387 # 03 Y:2001 03 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,830 $1,420 Not Implemented
AM0387 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $1,710 $3,300 Implemented
AM0387 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,450 $0 Implemented
AM0387 # 06 Y:2001 06 2001 PAY BILLS ON TIME TO AVOID LATE FEES $852 $0 Implemented
AM0387 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $620 $0 Implemented
AM0387 # 08 Y:2001 08 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $190 $0 Implemented
AM0387 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $160 $110 Implemented
AM0387 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $70 Not Implemented
AM0380 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,200 $1,000 Not Implemented
AM0380 # 02 Y:2000 02 2000 COMBINE UTILITY METERS $3,644 $8,000 Implemented
AM0380 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $50 Implemented
AM0380 # 04 Y:2000 04 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,798 $0 Implemented
AM0380 # 05 Y:2000 05 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $527 $800 Implemented
AM0380 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $25 Implemented
AM0380 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $1,000 Not Implemented
AM0380 # 08 Y:2000 08 2000 ELIMINATE/REDUCE AN OPERATION $392 $0 Not Implemented
AM0380 # 09 Y:2000 09 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $265 $0 Implemented
OK0601 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $3,500 Implemented
OK0601 # 02 Y:2000 02 2000 INSTALL COMMON HEADER ON COMPRESSORS $11,372 $3,000 Not Implemented
OK0601 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $17,881 $5,000 Implemented
OK0601 # 04 Y:2000 04 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $140,000 $100,000 Not Implemented