Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,195
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0642 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,027 | $1,450 | Implemented |
UD0642 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $400 | Implemented |
UD0642 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $338 | $800 | Not Implemented |
WV0234 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,079 | $800 | Implemented |
WV0234 # 02 Y:2002 | 02 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $9,910 | $4,200 | Implemented |
WV0234 # 03 Y:2002 | 03 | 2002 | USE OPTIMUM THICKNESS INSULATION | $6,520 | $2,125 | Not Implemented |
WV0234 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,825 | $660 | Implemented |
WV0234 # 05 Y:2002 | 05 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,903 | $4,076 | Not Implemented |
WV0234 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,512 | $2,020 | Not Implemented |
WV0234 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,201 | $22 | Implemented |
WV0234 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,732 | $1,650 | Implemented |
WV0234 # 09 Y:2002 | 09 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $712 | $758 | Not Implemented |
WV0234 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,260 | $1,342 | Not Implemented |
WV0234 # 11 Y:2002 | 11 | 2002 | CLEAR AND RENT EXISTING SPACE | $7,300 | $1,160 | Implemented |
WV0234 # 12 Y:2002 | 12 | 2002 | CLEAR AND RENT EXISTING SPACE | $50,000 | $1,500 | Not Implemented |
UD0639 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,669 | $17,123 | Not Implemented |
UD0639 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $2,052 | Implemented |
UD0639 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $450 | $1,698 | Implemented |
UD0639 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $418 | $0 | Implemented |
UD0632 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $94,812 | $8,000 | Implemented |
UD0632 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,500 | $6,000 | Not Implemented |
UD0632 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $15,075 | $0 | Not Implemented |
UD0632 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,915 | $0 | Implemented |
UD0632 # 05 Y:2001 | 05 | 2001 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,264 | $0 | Implemented |
UD0632 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,400 | $1,846 | Not Implemented |