IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,137

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0675 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $428 $2,730 Not Implemented
OK0675 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,672 $2,173 Not Implemented
OK0675 # 08 Y:2003 08 2003 INSTALL SET-BACK TIMERS $1,993 $0 Not Implemented
OK0675 # 09 Y:2003 09 2003 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $14,350 $23,640 Not Implemented
OK0675 # 10 Y:2003 10 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $61,378 $3,000 Not Implemented
OK0675 # 11 Y:2003 11 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $668 $287 Not Implemented
LE0174 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $16,235 $262 Implemented
LE0174 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,375 $48,722 Implemented
LE0174 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,320 $2,000 Not Implemented
LE0174 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,414 $0 Not Implemented
LE0174 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,251 $200 Implemented
LE0174 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,746 $750 Implemented
LE0174 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $1,050 Implemented
LE0174 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,585 $0 Implemented
LE0174 # 09 Y:2003 09 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $656 $0 Implemented
LE0174 # 10 Y:2003 10 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $1,100 Implemented
LE0174 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $224 $80 Implemented
GT0771 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,600 $0 Implemented
GT0771 # 02 Y:2003 02 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,568 $23,870 Implemented
GT0771 # 03 Y:2003 03 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $882 $650 Implemented
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented
GT0771 # 05 Y:2003 05 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,826 $1,248 Not Implemented
GT0771 # 06 Y:2003 06 2003 COVER OPEN TANKS $3,255 $3,703 Not Implemented
GT0771 # 07 Y:2003 07 2003 COVER OPEN TANKS $2,447 $3,500 Not Implemented
GT0771 # 08 Y:2003 08 2003 COVER OPEN TANKS $23,765 $700 Not Implemented