IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,137

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0349 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,435 $5,084 Implemented
AS0349 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,638 $7,500 Implemented
AS0349 # 08 Y:2003 08 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $878,532 $1,880,000 n/a
AS0349 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $3,515 $0 Implemented
AS0349 # 10 Y:2003 10 2003 MINIMIZE WATER USAGE $138 $60 Implemented
AS0349 # 11 Y:2003 11 2003 $603,884 $11,220 Not Implemented
BD0229 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,362 $38,415 n/a
BD0229 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,705 $14,480 Not Implemented
BD0229 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,910 $555 Not Implemented
BD0229 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,266 $9,660 Not Implemented
BD0229 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,676 $3,857 Implemented
BD0229 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,328 $1,275 Not Implemented
BD0229 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $736 $1,500 Not Implemented
BD0229 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $506 $500 Implemented
BD0229 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Not Implemented
BD0229 # 10 Y:2003 10 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,032 $72 Not Implemented
BD0229 # 11 Y:2003 11 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,958 $5,500 Not Implemented
BD0229 # 12 Y:2003 12 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $624 $600 Not Implemented
OR0429 # 01 Y:2003 01 2003 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $13,080 $43,350 Not Implemented
OR0429 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,040 $7,490 Not Implemented
OR0429 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,380 $2,400 Not Implemented
OR0429 # 04 Y:2003 04 2003 INSTALL COMMON HEADER ON COMPRESSORS $2,230 $4,750 Not Implemented
OR0429 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,025 $150 Not Implemented
OR0429 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $509 $1,800 Not Implemented
TA0048 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,000 $24,409 Implemented