Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,195
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0621 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,092 | $2,000 | Implemented |
UD0621 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,280 | $2,460 | Implemented |
UD0621 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $966 | $2,220 | Not Implemented |
UD0621 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $0 | Not Implemented |
UD0612 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,331 | $200 | Implemented |
UD0612 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,820 | $4,275 | Not Implemented |
UD0612 # 03 Y:2001 | 03 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $782 | $800 | Implemented |
UD0612 # 04 Y:2001 | 04 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $765 | $3,000 | Not Implemented |
UD0612 # 05 Y:2001 | 05 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $533 | $1,200 | Implemented |
UD0612 # 06 Y:2001 | 06 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $528 | $600 | Not Implemented |
UD0591 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,378 | $12,320 | Not Implemented |
UD0591 # 02 Y:2000 | 02 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $12,000 | $15,000 | Not Implemented |
UD0591 # 03 Y:2000 | 03 | 2000 | SELL USED PLATES TO AN ALUMINUM RECYCLER | $2,362 | $0 | Implemented |
UM0150 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,828 | $1,500 | Not Implemented |
UM0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $300 | Implemented |
UM0150 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,067 | $880 | Not Implemented |
UM0150 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,923 | $1,750 | Not Implemented |
UM0150 # 05 Y:1999 | 05 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $35,216 | $50,000 | Not Implemented |
UD0575 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $480,000 | $175,000 | Not Implemented |
UD0575 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $144,000 | $150,000 | Not Implemented |
UD0575 # 03 Y:1999 | 03 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $39,515 | $10,000 | Implemented |
UD0575 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,341 | $15,000 | Implemented |
UD0570 # 01 Y:1999 | 01 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $27,963 | $0 | Implemented |
UD0570 # 02 Y:1999 | 02 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,639 | $8,900 | Not Implemented |
UD0570 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,148 | $200 | Implemented |