Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0639 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $2,000 | Implemented |
MA0639 # 06 Y:2008 | 06 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $12,707 | $975 | Implemented |
MA0616 # 06 Y:2007 | 06 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $709 | $300 | Not Implemented |
MA0616 # 05 Y:2007 | 05 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $16,346 | $1,088 | Not Implemented |
MA0616 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $37,450 | $12,998 | Not Implemented |
MA0616 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,603 | $2,550 | Implemented |
MA0616 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,128 | $3,725 | Not Implemented |
MA0616 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,636 | $132,834 | Not Implemented |
MA0612 # 11 Y:2007 | 11 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,799 | $1,800 | Not Implemented |
MA0612 # 10 Y:2007 | 10 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,532 | $8,000 | Not Implemented |
MA0612 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,610 | $18,700 | Not Implemented |
MA0612 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $11,700 | Not Implemented |
MA0612 # 07 Y:2007 | 07 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,963 | $26,370 | Not Implemented |
MA0612 # 06 Y:2007 | 06 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,924 | $3,200 | Not Implemented |
MA0612 # 05 Y:2007 | 05 | 2007 | REDUCE VENTILATION AIR | $17,480 | $8,040 | Not Implemented |
MA0612 # 04 Y:2007 | 04 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $21,000 | $73,760 | Not Implemented |
MA0612 # 03 Y:2007 | 03 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $23,433 | $12,750 | Not Implemented |
MA0612 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $57,921 | $108,000 | Not Implemented |
MA0612 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $96,635 | $175,500 | Not Implemented |
MA0611 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM TEMPERATURE | $6,194 | $12,675 | Not Implemented |
MA0611 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $98,826 | $74,772 | Implemented |
MA0611 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,486 | $186,840 | Not Implemented |
MA0611 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $23,954 | $17,587 | Implemented |
MA0611 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,443 | $17,876 | Not Implemented |
MA0611 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,330 | $3,300 | Implemented |