IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

271

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0542 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $741 $140 Implemented
NC0542 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $3,364 $5,865 Implemented
NC0542 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,576 $510 Implemented
NC0542 # 07 Y:2015 07 2015 REDESIGN PROCESS $2,648 $500 Not Implemented
NC0542 # 06 Y:2015 06 2015 ISOLATE HOT OR COLD EQUIPMENT $5,296 $420 Implemented
NC0542 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,525 $3,000 Implemented
NC0542 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $3,000 Implemented
NC0542 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,264 $200 Implemented
NC0542 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,174 $20,250 Implemented
NC0531 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,255 Not Implemented
NC0531 # 05 Y:2014 05 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $625 $100 Implemented
NC0531 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,956 $1,935 Not Implemented
NC0531 # 07 Y:2014 07 2014 DEVELOP A REPAIR/REPLACE POLICY $2,202 $4,256 Implemented
NC0531 # 02 Y:2014 02 2014 UPGRADE CONTROLS ON COMPRESSORS $80,544 $28,000 Implemented
NC0531 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,220 $200 Implemented
NC0531 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $836 $240 Implemented
NC0524 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $160 Implemented
NC0524 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,264 $42,866 Implemented
NC0524 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,056 $100 Implemented
NC0524 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,368 $100 Implemented
NC0524 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,341 $29,000 Not Implemented
NC0524 # 05 Y:2014 05 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $606 $300 Implemented
NC0524 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,243 $475 Implemented
NC0524 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $2,718 $8,146 Implemented
NC0524 # 11 Y:2014 11 2014 REPAIR AND ELIMINATE STEAM LEAKS $1,126 $1,050 Implemented