IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,137

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0216 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,799 $549 Implemented
NC0216 # 05 Y:2001 05 2001 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,998 $40,000 Implemented
NC0216 # 06 Y:2001 06 2001 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $50,246 $30,000 Not Implemented
NC0216 # 07 Y:2001 07 2001 $130,124 $27,500 Not Implemented
OK0622 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,626 $2,120 Implemented
OK0622 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,659 $1,089 Implemented
OK0622 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,700 $654 Implemented
OK0622 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,944 $100 Not Implemented
OK0622 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $2,788 $288 Not Implemented
OK0622 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,100 $152,055 Implemented
OK0622 # 07 Y:2001 07 2001 $635,180 $125,000 Implemented
WV0214 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,402 $40 Implemented
WV0214 # 02 Y:2001 02 2001 REPAIR OR REPLACE STEAM TRAPS $1,680 $2,680 Implemented
WV0214 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $555 $588 Implemented
WV0214 # 04 Y:2001 04 2001 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $52,028 $185,000 Not Implemented
WV0214 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $659 $150 Not Implemented
WV0214 # 06 Y:2001 06 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,955 $1,500 Implemented
WV0214 # 07 Y:2001 07 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $35,000 $1,500 Not Implemented
WV0214 # 08 Y:2001 08 2001 BURN WASTE OIL FOR HEAT $3,772 $5,000 Not Implemented
WV0214 # 09 Y:2001 09 2001 $20,000 $7,000 Implemented
UD0623 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $32,488 $128,084 Not Implemented
UD0623 # 02 Y:2001 02 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $13,412 $700 Implemented
UD0623 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,127 $196 Implemented
UD0623 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,421 $11,978 Not Implemented
UD0623 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,301 $1,000 Not Implemented