IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,462

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0193 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $68,706 $29,000 Implemented
BD0193 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $44,275 $22,875 Implemented
BD0193 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $2,900 Implemented
BD0193 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $2,922 $1,875 Not Implemented
BD0193 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,570 $2,970 Not Implemented
BD0193 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,368 $2,660 Implemented
BD0193 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $1,000 Implemented
BD0193 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $350 Implemented
BD0193 # 09 Y:2001 09 2001 CONVERT TO ELECTROSTATIC POWDER COATING $42,843 $150,000 n/a
BD0193 # 10 Y:2001 10 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,710 $7,000 Not Implemented
BD0193 # 11 Y:2001 11 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $700 $180 Not Implemented
BD0193 # 12 Y:2001 12 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $663 $500 Not Implemented
BD0193 # 13 Y:2001 13 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $62,772 $5,000 Implemented
UD0632 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $94,812 $8,000 Implemented
UD0632 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,500 $6,000 Not Implemented
UD0632 # 03 Y:2001 03 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,075 $0 Not Implemented
UD0632 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,915 $0 Implemented
UD0632 # 05 Y:2001 05 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,264 $0 Implemented
UD0632 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,846 Not Implemented
UD0632 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,355 $0 Not Implemented
UD0632 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $315 $435 Not Implemented
UD0632 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $12 Not Implemented
UD0632 # 10 Y:2001 10 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $300 Not Implemented
BD0194 # 01 Y:2001 01 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $78,182 $160,000 n/a
BD0194 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,963 $2,000 Not Implemented