IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,103

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0846 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,168 $6,550 Implemented
AM0846 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,250 $4,570 Not Implemented
AM0846 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $250 $91 Not Implemented
AM0846 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $142 $62 Implemented
AM0846 # 08 Y:2022 08 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $137 $186 Not Implemented
AM0846 # 09 Y:2022 09 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $30 $0 Not Implemented
MU0001 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,472 $0 Not Implemented
MU0001 # 02 Y:2022 02 2022 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,156 $3,960 Implemented
MU0001 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,694 $600 Implemented
MU0001 # 04 Y:2022 04 2022 OPERATE BOILERS ON HIGH FIRE SETTING $2,532 $146 Implemented
MU0001 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,097 $16,000 Not Implemented
MU0001 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $228 $0 Implemented
CW0122 # 01 Y:2022 01 2022 TREAT AND REUSE RINSE WATERS $11,974 $2,500 n/a
CW0122 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,767 $400 n/a
CW0122 # 03 Y:2022 03 2022 CONVERT TO ROBOTIC PAINTING $102,960 $48,500 n/a
CW0122 # 04 Y:2022 04 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,171 $73,990 n/a
CW0122 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $13,037 $60,000 n/a
CW0122 # 06 Y:2022 06 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $42,376 $188,648 n/a
LE0521 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,738 $0 Implemented
LE0521 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $35 Implemented
LE0521 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,021 $800 Not Implemented
LE0521 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,127 $1,200 Implemented
LE0521 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,956 Not Implemented
LE0521 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $1,200 Implemented
LE0521 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,237 $11,000 Not Implemented