IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0434 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $43,502 $4,394 Not Implemented
AS0434 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,200 Not Implemented
AS0434 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,250 $2,513 Not Implemented
AS0434 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $60 Not Implemented
AS0434 # 06 Y:2017 06 2017 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $461 $450 Not Implemented
AS0434 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $307 $60 Implemented
SU0446 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,759 $0 Implemented
SU0446 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,711 $7,161 Not Implemented
SU0446 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $234 Not Implemented
SU0446 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $165 Implemented
SU0446 # 05 Y:2017 05 2017 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $6,295 $18,204 Not Implemented
SU0446 # 06 Y:2017 06 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $290 $854 Not Implemented
MZ0230 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $27,450 Implemented
MZ0230 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,308 $0 Implemented
MZ0230 # 03 Y:2017 03 2017 MINIMIZE WATER USAGE $199 $30 Implemented
MZ0230 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,896 $6,500 Not Implemented
MZ0230 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,927 $1,050 Implemented
SU0445 # 05 Y:2017 05 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $430 $1,799 Implemented
SU0445 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $62 $237 Implemented
SU0445 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $750 Implemented
SU0445 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,399 $3,850 Implemented
SU0445 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $122 $0 Implemented
DL0176 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,570 $0 Not Implemented
DL0176 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,480 $1,690 Not Implemented
DL0176 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,415 $16,875 Not Implemented