Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
152
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0298 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,600 | $53,730 | Implemented |
MS0298 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,377 | $17,617 | Implemented |
MS0298 # 03 Y:2006 | 03 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,854 | $1,700 | Not Implemented |
MS0298 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,964 | $236 | Implemented |
MS0298 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,852 | $2,775 | Implemented |
MS0298 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,739 | $1,313 | Implemented |
MS0128 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $441 | $94 | Implemented |
MS0128 # 02 Y:1999 | 02 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,291 | $149 | Implemented |
MS0128 # 03 Y:1999 | 03 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $905 | $472 | Implemented |
MS0128 # 04 Y:1999 | 04 | 1999 | USE RE-USABLE FILTERS | $143 | $160 | Implemented |
MS0119 # 01 Y:1998 | 01 | 1998 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $24,225 | $7,315 | Not Implemented |
MS0119 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,424 | $21,311 | Not Implemented |
MS0119 # 03 Y:1998 | 03 | 1998 | USE SYNTHETIC LUBRICANT | $1,266 | $440 | Implemented |
MS0119 # 04 Y:1998 | 04 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $32,240 | $31,500 | Implemented |
MS0119 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $109,983 | $0 | Implemented |
MS0119 # 06 Y:1998 | 06 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,511 | $10,368 | Not Implemented |
MS0119 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,580 | $31,767 | Not Implemented |
MS0119 # 08 Y:1998 | 08 | 1998 | BURN WASTE OIL FOR HEAT | $26,282 | $24,283 | Not Implemented |
MS0119 # 09 Y:1998 | 09 | 1998 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $8,100 | $5,729 | Not Implemented |
MS0119 # 10 Y:1998 | 10 | 1998 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $110,250 | $31,460 | Implemented |
GT0478 # 01 Y:1992 | 01 | 1992 | COVER OPEN TANKS | $1,480 | $1,910 | Not Implemented |
GT0478 # 02 Y:1992 | 02 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,120 | $900 | Not Implemented |
GT0478 # 03 Y:1992 | 03 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $940 | $240 | Not Implemented |
GT0478 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $420 | $450 | Not Implemented |
GT0478 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $120 | $0 | Not Implemented |