Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0333 # 03 Y:2006 | 03 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,142 | $1,000 | Not Implemented |
NC0333 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,756 | $50 | Not Implemented |
NC0333 # 05 Y:2006 | 05 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,913 | $300 | Implemented |
NC0333 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $395 | $150 | Implemented |
NC0333 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $135 | $185 | Implemented |
NC0333 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $278 | $100 | Implemented |
NC0333 # 09 Y:2006 | 09 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,628 | $3,000 | Not Implemented |
NC0333 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,550 | $4,000 | Not Implemented |
NC0262 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,471 | $10,000 | Not Implemented |
NC0262 # 02 Y:2003 | 02 | 2003 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $33,773 | $55,000 | Not Implemented |
NC0262 # 03 Y:2003 | 03 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,320 | $5,653 | Not Implemented |
NC0262 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,339 | $50 | Not Implemented |
NC0262 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,272 | $5,225 | Not Implemented |
NC0262 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,284 | $800 | Not Implemented |
WV0251 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,178 | $630 | Implemented |
WV0251 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,295 | $180 | Implemented |
WV0251 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,218 | $0 | Implemented |
WV0251 # 04 Y:2002 | 04 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,860 | $948 | Implemented |
WV0251 # 05 Y:2002 | 05 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,680 | $3,000 | Not Implemented |
WV0251 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,786 | $600 | Implemented |
WV0251 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,709 | $180 | Implemented |
WV0251 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,964 | $8,610 | Implemented |
WV0251 # 09 Y:2002 | 09 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $3,575 | $830 | Not Implemented |
WV0251 # 10 Y:2002 | 10 | 2002 | ADD ADDITIONAL PRODUCTION SHIFT | $34,000 | $2,000 | Not Implemented |
WV0251 # 11 Y:2002 | 11 | 2002 | ADVERTISE PRODUCT OR SERVICE | $16,140 | $1,000 | Implemented |