Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,260
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0543 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,652 | $12,363 | Implemented |
SF0543 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,639 | $23,288 | Implemented |
MI0355 # 01 Y:2019 | 01 | 2019 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $139,703 | $245,760 | Not Implemented |
MI0355 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $103,161 | $14,000 | Implemented |
MI0355 # 03 Y:2019 | 03 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $91,845 | $61,708 | Not Implemented |
MI0355 # 04 Y:2019 | 04 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $95,703 | $480 | Not Implemented |
MI0355 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,941 | $59,135 | Implemented |
MI0355 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,441 | $72,870 | Implemented |
MI0355 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $13,642 | $960 | Not Implemented |
MI0355 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,503 | $2,020 | Not Implemented |
MI0355 # 09 Y:2019 | 09 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,604 | $2,070 | Implemented |
MZ0276 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $60 | Implemented |
MZ0276 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $249 | $1,040 | Implemented |
MZ0276 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,641 | $180 | Implemented |
MZ0276 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,070 | $184,040 | Implemented |
MZ0276 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $367 | $120 | Implemented |
MZ0276 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $191 | $390 | Implemented |
LE0477 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,091 | $0 | Not Implemented |
LE0477 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $179 | $80 | Implemented |
LE0477 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,343 | $40,000 | Not Implemented |
LE0477 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,531 | $5,300 | Implemented |
LE0477 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,914 | $96,000 | Implemented |
SD0583 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,060 | $16,920 | Not Implemented |
SD0583 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $30,675 | $66,500 | Implemented |
SD0583 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,834 | $8,535 | Implemented |