IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

549

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0368 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $6,924 Not Implemented
IA0360 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $526 Implemented
IA0360 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $25 Not Implemented
IA0360 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,026 $20,803 Not Implemented
IA0360 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,226 $1,876 Not Implemented
IA0360 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,221 $2,849 Not Implemented
IA0360 # 06 Y:2005 06 2005 INSTALL STORM WINDOWS AND DOORS $2,828 $4,371 Implemented
IA0360 # 07 Y:2005 07 2005 MAINTAIN MACHINES TO REDUCE LEAKS $656 $147 Implemented
IA0360 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $2,470 $400 Not Implemented
IA0360 # 09 Y:2005 09 2005 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $3,570 $400 Implemented
IA0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,846 $446 Implemented
IA0343 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,120 $1,866 Not Implemented
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $817 $1,230 Not Implemented
IA0343 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,859 $9,696 Not Implemented
IA0343 # 07 Y:2004 07 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,733 $10,000 Implemented
IA0341 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,506 $1,200 Not Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented
IA0341 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,990 Implemented
IA0341 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $123 $289 Implemented