IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0302 # 02 Y:2010 02 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $43,590 $6,000 Not Implemented
LE0302 # 03 Y:2010 03 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $19,885 $35,220 Not Implemented
LE0302 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,289 $6,000 Not Implemented
LE0302 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,786 $1,720 Implemented
LE0302 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $46,342 $10,000 Implemented
LE0302 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $18,237 $12,000 Not Implemented
LE0302 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,646 $480 Implemented
LE0302 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,383 $15,780 Not Implemented
LE0302 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $1,414 $300 Not Implemented
LE0297 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,029 $785 Implemented
LE0297 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $1,760 Implemented
LE0297 # 03 Y:2010 03 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,903 $3,000 Not Implemented
LE0297 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,627 $66,360 Not Implemented
LE0297 # 05 Y:2010 05 2010 INSTALL TIMERS AND/OR THERMOSTATS $2,326 $450 Not Implemented
LE0297 # 06 Y:2010 06 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,367 $4,500 Not Implemented
LE0297 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,239 $1,000 Not Implemented
LE0297 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $935 $800 Not Implemented
LE0297 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,807 $55,184 Not Implemented
LE0297 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $983 $450 Not Implemented
SU0293 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,252 $0 Not Implemented
SU0293 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,692 $0 Not Implemented
SU0293 # 03 Y:2010 03 2010 USE SYNTHETIC LUBRICANT $3,669 $0 Not Implemented
SU0293 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,942 $0 Not Implemented
SU0293 # 05 Y:2010 05 2010 PAY BILLS ON TIME TO AVOID LATE FEES $2,435 $0 Not Implemented
SU0293 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,028 $0 Not Implemented