Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
871
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0816 # 12 Y:2011 | 12 | 2011 | INSULATE BARE EQUIPMENT | $1,893 | $2,263 | Not Implemented |
OK0812 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $34,390 | $92,072 | Implemented |
OK0812 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $750 | Implemented |
OK0812 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $11,401 | $77,770 | Not Implemented |
OK0812 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $6,323 | $26,111 | Implemented |
OK0812 # 05 Y:2011 | 05 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $13,390 | $7,255 | Not Implemented |
OK0812 # 06 Y:2011 | 06 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $12,936 | $21,477 | Not Implemented |
OK0812 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,301 | $7,605 | Not Implemented |
OK0812 # 08 Y:2011 | 08 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,925 | $14,300 | Implemented |
OK0812 # 09 Y:2011 | 09 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $801 | $353 | Implemented |
OK0812 # 10 Y:2011 | 10 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,148 | $7,130 | Not Implemented |
OK0800 # 01 Y:2010 | 01 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,533 | $32,670 | Not Implemented |
OK0800 # 02 Y:2010 | 02 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,667 | $2,700 | Implemented |
OK0800 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $209 | $334 | Implemented |
OK0800 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $860 | $1,865 | Implemented |
OK0800 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $706 | Implemented |
OK0800 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $1,678 | Implemented |
OK0800 # 07 Y:2010 | 07 | 2010 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,127 | $0 | Not Implemented |
OK0796 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $16,798 | $29,735 | Not Implemented |
OK0796 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,028 | $14,578 | Implemented |
OK0796 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,129 | $5,526 | Implemented |
OK0796 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,660 | $1,378 | Not Implemented |
OK0796 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,383 | $500 | Implemented |
OK0796 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $851 | $217 | Not Implemented |
OK0796 # 07 Y:2010 | 07 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,028 | $23,000 | Not Implemented |