Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
456
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0027 # 07 Y:2023 | 07 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $91 | $600 | n/a |
CC0027 # 08 Y:2023 | 08 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,290 | $782,250 | n/a |
CC0027 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,444 | $8,455 | n/a |
CC0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $176 | $351 | n/a |
CC0027 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,571 | $25,000 | n/a |
CC0027 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,831 | $10,000 | n/a |
CC0027 # 05 Y:2023 | 05 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $26,412 | $80,000 | n/a |
CC0027 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,831 | $93,870 | n/a |
CC0023 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,864 | $750,960 | n/a |
CC0023 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $55,102 | $47,144 | n/a |
CC0023 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,633 | $40,000 | n/a |
CC0015 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $278 | $400 | n/a |
CC0015 # 04 Y:2023 | 04 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $199 | $360 | n/a |
CC0015 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,040 | $7,085 | n/a |
CC0015 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $2,000 | n/a |
NC0652 # 01 Y:2020 | 01 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,160 | $100 | Not Implemented |
NC0652 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $631 | $700 | Implemented |
NC0652 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $390 | Implemented |
NC0652 # 04 Y:2020 | 04 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,865 | $500 | Implemented |
NC0652 # 05 Y:2020 | 05 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $40,922 | $1,000 | Not Implemented |
NC0652 # 06 Y:2020 | 06 | 2020 | CONDENSE OPERATION INTO ONE BUILDING | $6,086 | $4,800 | Not Implemented |
NC0653 # 02 Y:2020 | 02 | 2020 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $22,483 | $4,000 | Not Implemented |
NC0653 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,814 | $4,460 | Not Implemented |
NC0653 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $382,429 | $2,300,000 | Not Implemented |
NC0647 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,880 | $5,000 | Not Implemented |