IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0139 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,467 $72,797 Not Implemented
MA0140 # 02 Y:1988 02 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $291 $2,450 Not Implemented
MA0139 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,534 $85,000 Implemented
MA0140 # 06 Y:1988 06 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,506 $183 Not Implemented
MA0140 # 03 Y:1988 03 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $110 Implemented
MA0139 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $6,928 $2,859 Implemented
MA0140 # 07 Y:1988 07 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,733 $1,700 Implemented
GT0365 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,054 $32,379 Implemented
MA0139 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,222 $3,943 Not Implemented
GT0365 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,041 $800 Implemented
GT0365 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $284 Not Implemented
MA0140 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $2,450 $340 Implemented
MA0139 # 03 Y:1988 03 1988 OPTIMIZE PLANT POWER FACTOR $19,447 $9,000 Implemented
MA0140 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,772 $10,500 Implemented
MA0140 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $790 $260 Not Implemented
GT0365 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $202 $0 Implemented
GT0363 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $66,800 $45,607 Not Implemented
CO0137 # 02 Y:1988 02 1988 OPTIMIZE PLANT POWER FACTOR $4,000 $5,850 Implemented
CO0137 # 03 Y:1988 03 1988 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,070 $19,800 Not Implemented
CO0137 # 01 Y:1988 01 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,200 $500 Implemented
GT0363 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,945 $200 Not Implemented
GT0363 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $377 Not Implemented
GT0363 # 04 Y:1988 04 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,120 $4,685 Not Implemented
GT0363 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $370 Not Implemented
GT0363 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $930 $840 Not Implemented