IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

335

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0260 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,970 $120,000 Implemented
CO0260 # 11 Y:1992 11 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $106 $900 Implemented
CO0260 # 10 Y:1992 10 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $300 $150 Implemented
CO0260 # 09 Y:1992 09 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,880 $7,700 Implemented
CO0260 # 12 Y:1992 12 1992 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,750 $20,280 Implemented
CO0260 # 13 Y:1992 13 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,130 $2,870 Implemented
CO0260 # 14 Y:1992 14 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $820 $2,610 Implemented
CO0260 # 05 Y:1992 05 1992 COVER OPEN TANKS $13,870 $4,000 Implemented
CO0260 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $500 Implemented
CO0260 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,920 $8,750 Implemented
CO0260 # 06 Y:1992 06 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $176,510 $40,000 Implemented
CO0260 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $1,500 $700 Implemented
CO0260 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,200 $1,000 Implemented
CO0260 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,820 $310 Implemented
MA0259 # 02 Y:1992 02 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $3,084 $0 Not Implemented
MA0259 # 05 Y:1992 05 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $686 $2,108 Not Implemented
MA0259 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $396 $168 Not Implemented
MA0259 # 01 Y:1992 01 1992 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $8,134 $0 Not Implemented
MA0259 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $562 $509 Not Implemented
MA0259 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $0 Not Implemented
MA0259 # 08 Y:1992 08 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $292 $180 Not Implemented
MA0259 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $584 $0 Not Implemented
GT0481 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,300 $900 Implemented
GT0481 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,814 $22,050 Implemented
GT0481 # 10 Y:1992 10 1992 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $175,445 $450,000 Implemented