IAC Assessment: GT0481
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0481
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product NEEDLE BEARINGS
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 423
Plant Area (Sq.Ft.) 0
Annual Production 66,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,125,266 22,075,323 kWh $0.05
Natural Gas $168,482 59,098 MMBtu $2.85
TOTAL ENERGY COSTS $1,293,748
RECOMMENDED SAVINGS* $296,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $296,474
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,300
Cost:
$900
- - $2,300 807 - - - - -
-
kWh
$2,300
807
MMBtu
-
-
MMBtu
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$23,265
Cost:
$7,500
- - $23,265 8,309 - - - - -
-
kWh
$23,265
8,309
MMBtu
-
-
MMBtu
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$46,920
Cost:
$60,000
- - $46,920 16,760 - - - - -
-
kWh
$46,920
16,760
MMBtu
-
-
MMBtu
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$5,790
Cost:
$800
$5,790 113,716 - - - - - - $5,790
113,716
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$498
Cost:
$2,540
$498 9,672 - - - - - - $498
9,672
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$545
Cost:
-
$545 10,551 - - - - - - $545
10,551
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,197
Cost:
$7,700
$1,197 23,447 - - - - - - $1,197
23,447
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,700
Cost:
$40,240
$37,700 739,449 - - - - - - $37,700
739,449
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,814
Cost:
$22,050
$3,073 60,375 - - - - $(-259) - $3,073
60,375
kWh
-
-
MMBtu
-
-
MMBtu
$(-259)
-
$
10: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$175,445
Cost:
$450,000
$189,619 191,970 - - $(-14,174) (-1,985) - - $189,619
191,970
kWh
-
-
MMBtu
$(-14,174)
(-1,985)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$296,474
Cost:
$591,730
$238,422 1,149,180 $72,485 25,876 $(-14,174) (-1,985) $(-259) - $238,422
1,149,180
kWh
$72,485
25,876
MMBtu
$(-14,174)
(-1,985)
MMBtu
$(-259)
-
$
TOTAL IMPLEMENTED Savings:
$296,474
Cost:
$591,730
$238,422 1,149,180 $72,485 25,876 $(-14,174) (-1,985) $(-259) - $238,422
1,149,180
kWh
$72,485
25,876
MMBtu
$(-14,174)
(-1,985)
MMBtu
$(-259)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes