IAC Assessment: MA0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1992
Principal Product SMALL HARDWARE ITEMS
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 55,000,000 Pieces
Production Hrs. Annual 2,125
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,091 1,473,623 kWh $0.11
Natural Gas $25,726 3,673 MMBtu $7.00
Fuel Oil #4 $57,514 13,069 MMBtu $4.40
TOTAL ENERGY COSTS $246,331
RECOMMENDED SAVINGS* $14,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$8,134
Cost:
-
- - $8,134 1,162 - - - - -
-
kWh
$8,134
1,162
MMBtu
-
-
MMBtu
-
-
$
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$3,084
Cost:
-
- - $(-5,179) (-1,254) $8,263 1,878 - - -
-
kWh
$(-5,179)
(-1,254)
MMBtu
$8,263
1,878
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$487
Cost:
-
$621 5,569 - - - - $(-134) - $621
5,569
kWh
-
-
MMBtu
-
-
MMBtu
$(-134)
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$562
Cost:
$509
$562 - - - - - - - $562
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$686
Cost:
$2,108
- - - - $686 156 - - -
-
kWh
-
-
MMBtu
$686
156
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$584
Cost:
-
$584 5,275 - - - - - - $584
5,275
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$396
Cost:
$168
- - - - $396 90 - - -
-
kWh
-
-
MMBtu
$396
90
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$292
Cost:
$180
$292 2,638 - - - - - - $292
2,638
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,225
Cost:
$2,965
$2,059 13,482 $2,955 (-92) $9,345 2,124 $(-134) - $2,059
13,482
kWh
$2,955
(-92)
MMBtu
$9,345
2,124
MMBtu
$(-134)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes