Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
509
matching recommendationsSIC | 351 | Engines And Turbines |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0668 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $300 | $1,214 | n/a |
SD0668 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $254,982 | $555,003 | n/a |
SD0668 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,775 | $0 | n/a |
SD0668 # 05 Y:2025 | 05 | 2025 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,614 | $4,200 | n/a |
SD0668 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $922 | $1,623 | n/a |
SD0668 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,208 | $2,050 | n/a |
SD0668 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $134,656 | $0 | n/a |
SD0668 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,230 | $3,246 | n/a |
SD0668 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $66,206 | $29,341 | n/a |
MZ0361 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,158 | $1,750 | n/a |
MZ0361 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $71,580 | $385,388 | n/a |
MZ0361 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,882 | $33,744 | n/a |
MZ0361 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,316 | $3,602,500 | n/a |
MZ0361 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,374 | $117,036 | n/a |
MZ0361 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,784 | $1,000 | n/a |
MZ0361 # 06 Y:2024 | 06 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $45,827 | $6,720 | n/a |
MZ0361 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,633 | $6,555 | n/a |
MZ0361 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,797 | $4,800 | n/a |
WV0660 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $8,339 | $2,225 | Implemented |
WV0660 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,956 | $1,323 | Implemented |
WV0660 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,979 | $4,576 | Implemented |
WV0660 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $22,781 | $18,776 | Not Implemented |
WV0660 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $19,324 | $10,600 | Not Implemented |
WV0660 # 04 Y:2024 | 04 | 2024 | INSTALL SET-BACK TIMERS | $8,713 | $1,125 | Implemented |
WV0660 # 09 Y:2024 | 09 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $104 | Implemented |