IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

500

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0178 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53,553 $7,140 Implemented
MI0178 # 03 Y:2009 03 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $18,854 $40,320 Not Implemented
MI0178 # 04 Y:2009 04 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $17,481 $11,118 Not Implemented
MI0178 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,720 $1,210 Implemented
MI0178 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,908 $4,531 Implemented
MI0178 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $40 Implemented
MA0646 # 01 Y:2009 01 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,158 $8,683 Not Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $3,610 Not Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,450 $5,195 Not Implemented
OK0762 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164,842 $297,920 Implemented
OK0762 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $14,224 $54,912 Implemented
OK0762 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,433 $104,000 Not Implemented
OK0762 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,975 $8,646 Not Implemented
OK0762 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,605 $1,000 Implemented
OK0762 # 06 Y:2008 06 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $238,891 $232,766 Implemented
OK0762 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,165 $0 Implemented
MI0148 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,264 $915 Not Implemented
MI0148 # 02 Y:2007 02 2007 DISCONNECT BALLASTS $5,169 $2,150 Not Implemented
MI0148 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,272 $10,200 Not Implemented
MI0148 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $5,197 $16,736 Not Implemented
MI0148 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,074 Not Implemented
MI0148 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,961 $3,010 Not Implemented
MI0148 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $1,423 Not Implemented