IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

491

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1070 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,927 $3,985 Not Implemented
OK1070 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,761 $4,884 Not Implemented
OK1070 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,533 $440 Not Implemented
MZ0300 # 07 Y:2020 07 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,578 $3,168 Not Implemented
MZ0300 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $200 Implemented
MZ0300 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,678 $3,310 Not Implemented
MZ0300 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,728 $4,770 Not Implemented
MZ0300 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,074 $5,200 Not Implemented
MZ0300 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $783 $460 Not Implemented
MZ0300 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,598 $1,650 Implemented
MA0818 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,422 $970 Not Implemented
MA0818 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,320 $9,808 Implemented
MA0818 # 03 Y:2020 03 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,714 $5,600 Not Implemented
MA0818 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $837 $4,000 Not Implemented
MA0818 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $789 $1,700 Implemented
MA0818 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $782 $2,450 Not Implemented
MA0818 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $500 Implemented
OK1023 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $0 Not Implemented
OK1023 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,606 $4,736 Not Implemented
OK1023 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $464 $1,236 Not Implemented
OK1023 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $915 $3,252 Not Implemented
OK1023 # 05 Y:2020 05 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $415 $538 Not Implemented
OK1023 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,874 $15,402 Not Implemented
LE0479 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $310 Not Implemented
LE0479 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,431 $9,000 Not Implemented