IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0109 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,496 $2,100 Implemented
IC0109 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $37,809 $131,160 Not Implemented
IC0109 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,239 $400 Implemented
IC0109 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,632 $22,464 Not Implemented
IC0109 # 03 Y:2005 03 2005 REPLACE BOILER $294,938 $501,372 Not Implemented
IC0109 # 02 Y:2005 02 2005 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $437,212 $3,259,200 Not Implemented
IC0109 # 01 Y:2005 01 2005 MODIFY WORKLOAD $25,000 $0 Implemented
WI0287 # 02 Y:1997 02 1997 RECOVER WASTE HEAT FROM EQUIPMENT $27,837 $11,500 Not Implemented
WI0287 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $220 $0 Not Implemented
WI0287 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $736 Implemented
WI0287 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $30 Not Implemented
WI0287 # 06 Y:1997 06 1997 TREAT AND REUSE RINSE WATERS $1,041 $1,475 Implemented
WI0287 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,279 $400 Not Implemented
WI0287 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,602 $5,000 Not Implemented
WI0287 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,030 $0 Not Implemented
WI0287 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $71,155 $98,280 Not Implemented
IA0064 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,534 $4,388 Implemented
IA0064 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $3,716 $648 Not Implemented
IA0064 # 03 Y:1993 03 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,920 $6,676 Implemented
IA0064 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,322 $2,500 Implemented
IA0064 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,740 $2,585 Implemented
IA0064 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $0 Implemented
IA0064 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $2,751 Not Implemented