IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 351 Engines And Turbines
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0522 # 11 Y:2014 11 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $971 $3,500 Implemented
NC0522 # 10 Y:2014 10 2014 DEVELOP A REPAIR/REPLACE POLICY $1,616 $4,256 Not Implemented
NC0522 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $455 $400 Not Implemented
NC0522 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $208 Implemented
NC0522 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $309 Implemented
NC0522 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $472 $320 Not Implemented
NC0522 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Implemented
NC0522 # 01 Y:2014 01 2014 RECOVER AND REUSE COOLING WATER $3,379 $6,500 Not Implemented
NC0522 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,436 $5,000 Not Implemented
NC0522 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,823 $1,500 Implemented
NC0522 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,016 $3,500 Not Implemented
NC0263 # 02 Y:2003 02 2003 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $22,423 $10,000 Not Implemented
NC0263 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $240 Implemented
NC0263 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $680 Implemented
NC0263 # 06 Y:2003 06 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $46,271 $135,400 Not Implemented
NC0263 # 05 Y:2003 05 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,768 $10,000 Not Implemented
NC0263 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $47,210 $100,000 Implemented
NC0263 # 03 Y:2003 03 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $33,114 $24,600 Not Implemented
NC0263 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $118,487 $500 Not Implemented
TN0646 # 01 Y:1998 01 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $603,410 $51,350 Implemented
TN0646 # 02 Y:1998 02 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,800 $21,900 Implemented
TN0646 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $8,900 $13,600 Implemented
TN0646 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $5,000 Implemented
TN0646 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $0 Implemented
TN0646 # 06 Y:1998 06 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,600 $0 Not Implemented