Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 351 | Engines And Turbines |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0436 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,924 | $2,500 | Implemented |
UM0436 # 02 Y:2013 | 02 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $24,443 | $12,800 | Not Implemented |
TT0112 # 01 Y:2013 | 01 | 2013 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $4,915 | $4,690 | Not Implemented |
TT0112 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,630 | $2,600 | Implemented |
TT0112 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $145 | $700 | Implemented |
TT0112 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,571 | $25,960 | Implemented |
TT0112 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,801 | $5,122 | Implemented |
TT0112 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54 | $394 | Implemented |
TT0112 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,345 | $15,200 | Not Implemented |
MZ0113 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $3,575 | $3,500 | Implemented |
MZ0113 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $545 | $902 | Implemented |
MZ0113 # 05 Y:2013 | 05 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,613 | $4,973 | Implemented |
MZ0113 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,882 | $1,698 | Implemented |
MZ0113 # 03 Y:2013 | 03 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $7,609 | $1,000 | Implemented |
MZ0113 # 02 Y:2013 | 02 | 2013 | INSTALL SKYLIGHTS | $14,502 | $50,050 | Not Implemented |
MZ0113 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,414 | $8,758 | Implemented |
MZ0113 # 07 Y:2013 | 07 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,948 | $50 | Implemented |
MZ0113 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $1,050 | Implemented |
MZ0113 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,620 | $900 | Implemented |
MZ0113 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $620 | Implemented |
IA0497 # 03 Y:2013 | 03 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,575 | $3,675 | Not Implemented |
IA0497 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,881 | $4,000 | Not Implemented |
IA0497 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,468 | $1,500 | Implemented |
IA0497 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,000 | $7,560 | Not Implemented |
IA0497 # 02 Y:2013 | 02 | 2013 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,463 | $2,391 | Not Implemented |