IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
Reset
SIC 3511 Turbines And Turbine Generator Sets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0112 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,345 $15,200 Not Implemented
TT0112 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54 $394 Implemented
TT0112 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,801 $5,122 Implemented
TT0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,571 $25,960 Implemented
TT0112 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $145 $700 Implemented
TT0112 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,630 $2,600 Implemented
TT0112 # 01 Y:2013 01 2013 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $4,915 $4,690 Not Implemented
IA0493 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,998 $128,338 Implemented
IA0493 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,326 $2,120 Not Implemented
IA0493 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,452 $2,000 Implemented
IA0493 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,291 $105 Implemented
IA0493 # 05 Y:2013 05 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,659 $3,000 Not Implemented
IA0493 # 06 Y:2013 06 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $328 $200 Not Implemented
MI0178 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53,553 $7,140 Implemented
MI0178 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,282 $40 Implemented
MI0178 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,908 $4,531 Implemented
MI0178 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,720 $1,210 Implemented
MI0178 # 04 Y:2009 04 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $17,481 $11,118 Not Implemented
MI0178 # 03 Y:2009 03 2009 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $18,854 $40,320 Not Implemented
MI0178 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,417 $70,875 Not Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $3,610 Not Implemented
MA0646 # 01 Y:2009 01 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,158 $8,683 Not Implemented
MA0646 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,450 $5,195 Not Implemented