IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
SIC 3519 Internal Combustion Engines, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0149 # 01 Y:2015 01 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $12,531 $1,500 Not Implemented
NC0522 # 01 Y:2014 01 2014 RECOVER AND REUSE COOLING WATER $3,379 $6,500 Not Implemented
NC0522 # 11 Y:2014 11 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $971 $3,500 Implemented
NC0522 # 10 Y:2014 10 2014 DEVELOP A REPAIR/REPLACE POLICY $1,616 $4,256 Not Implemented
NC0522 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $455 $400 Not Implemented
NC0522 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $208 Implemented
NC0522 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $309 Implemented
NC0522 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $472 $320 Not Implemented
NC0522 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Implemented
NC0522 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,016 $3,500 Not Implemented
NC0522 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,823 $1,500 Implemented
NC0522 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,436 $5,000 Not Implemented
UM0436 # 02 Y:2013 02 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $24,443 $12,800 Not Implemented
UM0436 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,924 $2,500 Implemented
MZ0113 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,414 $8,758 Implemented
MZ0113 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $7,609 $1,000 Implemented
MZ0113 # 02 Y:2013 02 2013 INSTALL SKYLIGHTS $14,502 $50,050 Not Implemented
MZ0113 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,882 $1,698 Implemented
MZ0113 # 05 Y:2013 05 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $3,613 $4,973 Implemented
MZ0113 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $3,575 $3,500 Implemented
MZ0113 # 09 Y:2013 09 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $545 $902 Implemented
MZ0113 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $488 $1,050 Implemented
MZ0113 # 10 Y:2013 10 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $620 Implemented
MZ0113 # 07 Y:2013 07 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,948 $50 Implemented
MZ0113 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,620 $900 Implemented