IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3519 Internal Combustion Engines, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1023 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,874 $15,402 Not Implemented
OK1023 # 05 Y:2020 05 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $415 $538 Not Implemented
OK1023 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $915 $3,252 Not Implemented
OK1023 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $464 $1,236 Not Implemented
OK1023 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,606 $4,736 Not Implemented
OK1023 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $0 Not Implemented
OK0762 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,165 $0 Implemented
OK0762 # 06 Y:2008 06 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $238,891 $232,766 Implemented
OK0762 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,605 $1,000 Implemented
OK0762 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,975 $8,646 Not Implemented
OK0762 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,433 $104,000 Not Implemented
OK0762 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $14,224 $54,912 Implemented
OK0762 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164,842 $297,920 Implemented
OK0399 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $644 $0 Implemented
OK0399 # 11 Y:1993 11 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,570 $0 Not Implemented
OK0399 # 10 Y:1993 10 1993 USE POWER DURING OFF-PEAK PERIODS $10,811 $0 Not Implemented
OK0399 # 08 Y:1993 08 1993 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $743 $880 Implemented
OK0399 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $416 $100 Not Implemented
OK0399 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,418 $10,680 Implemented
OK0399 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,137 $0 Implemented
OK0399 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $546 Implemented
OK0399 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,239 $3,560 Implemented
OK0399 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $133 $452 Not Implemented
OK0399 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $662 $0 Implemented
OK0146 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $142 $525 Not Implemented