IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 352 Farm And Garden Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0245 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,789 $4,500 Not Implemented
TT0245 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,356 $900 Not Implemented
TN0693 # 09 Y:2000 09 2000 RECOVER AND REUSE WASTE MATERIAL $750 $570 Not Implemented
TN0693 # 08 Y:2000 08 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,357 $490 Implemented
TN0693 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,503 $900 Not Implemented
TN0693 # 01 Y:2000 01 2000 $77,500 $35,600 Not Implemented
TN0693 # 02 Y:2000 02 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $69,815 $1,200 Implemented
TN0693 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $22,100 $8,120 Implemented
TN0693 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,000 $35,070 Implemented
TN0693 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,176 $379 Not Implemented
TN0693 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,508 $18,900 Not Implemented
TN0629 # 03 Y:1998 03 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $24,360 $9,800 Not Implemented
TN0629 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $1,800 Not Implemented
TN0629 # 04 Y:1998 04 1998 $21,285 $25,800 Implemented
TN0629 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $16,270 $0 Not Implemented
TN0629 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,370 $10,185 Not Implemented
TN0629 # 07 Y:1998 07 1998 REDESIGN PROCESS $2,675 $1,100 Implemented
TN0629 # 02 Y:1998 02 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $35,290 $98,000 Not Implemented
TN0629 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $62,560 $5,700 Implemented
TN0629 # 09 Y:1998 09 1998 METER WASTE WATER $1,210 $2,980 Implemented
TN0306 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $522 $3,600 Implemented
TN0306 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,231 $150 Implemented
TN0306 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $397 $0 Implemented