Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 352 | Farm And Garden Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0384 # 09 Y:2004 | 09 | 2004 | INSULATE BARE EQUIPMENT | $902 | $251 | Implemented |
AS0384 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $904 | $961 | Not Implemented |
AS0384 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,575 | $20 | Implemented |
AS0384 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,696 | $3,600 | Not Implemented |
AS0384 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,859 | $180 | Implemented |
AS0384 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,206 | $88,805 | Not Implemented |
AS0384 # 03 Y:2004 | 03 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $26,000 | $22,316 | Implemented |
AS0384 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,877 | $495 | Not Implemented |
AS0384 # 01 Y:2004 | 01 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $58,500 | $1,130 | Not Implemented |
IA0341 # 02 Y:2004 | 02 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,502 | $700 | Implemented |
IA0341 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $123 | $289 | Implemented |
IA0341 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $1,990 | Implemented |
IA0341 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $182 | $194 | Implemented |
IA0341 # 05 Y:2004 | 05 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,040 | $54,300 | Implemented |
IA0341 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $727 | $105 | Implemented |
IA0341 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,519 | $460 | Implemented |
IA0341 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $7,506 | $1,200 | Not Implemented |
AM0455 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,350 | $14,400 | Not Implemented |
AM0455 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $1,500 | Implemented |
AM0455 # 05 Y:2004 | 05 | 2004 | COMBINE UTILITY METERS | $528 | $0 | Implemented |
AM0455 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $200 | $0 | Implemented |
AM0455 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $120 | $74 | Implemented |
AM0455 # 02 Y:2004 | 02 | 2004 | REUSE RAGS UNTIL COMPLETELY SOILED | $1,800 | $0 | Not Implemented |
AM0455 # 01 Y:2004 | 01 | 2004 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $141,300 | $680 | Not Implemented |