IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 353 Construction And Related Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0001 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $228 $0 Implemented
MU0001 # 04 Y:2022 04 2022 OPERATE BOILERS ON HIGH FIRE SETTING $2,532 $146 Implemented
MU0001 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,694 $600 Implemented
MU0001 # 02 Y:2022 02 2022 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,156 $3,960 Implemented
UM0285 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,874 $9,682 Implemented
UM0285 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,033 $750 Implemented
UM0285 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,991 $0 Implemented
UM0285 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $915 $0 Implemented
IC0080 # 04 Y:2004 04 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $40,931 $95,360 Implemented
IC0080 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,301 $900 Implemented
IC0080 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,280 $10,420 Implemented
IC0080 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $0 Implemented
IC0080 # 13 Y:2004 13 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $49 Implemented
IC0080 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,354 $2,640 Implemented
IC0080 # 07 Y:2004 07 2004 USE OPTIMUM TEMPERATURE $62,610 $35,948 Implemented
IC0080 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $1,540 Implemented
IC0080 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $896 Implemented
IC0080 # 14 Y:2004 14 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $258 $0 Implemented
UM0247 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,882 $7,500 Implemented
UM0247 # 06 Y:2004 06 2004 INSTALL COMMON HEADER ON COMPRESSORS $1,888 $1,100 Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
UM0110 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $100 Implemented
UM0110 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,480 $1,000 Implemented
UM0110 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,394 $624 Implemented